Case study · Build

A customer experience center, and the standard behind it.

Designing an enterprise briefing environment for a global technology manufacturer, then writing it down so eight facilities in three countries could be built from it.

Client
A global technology manufacturer
Role
Experience Design & Production Lead
Period
2025–2026
Location
Silicon Valley, plus a rollout across Asia
8facilities covered by the documented standard
3countries in the rollout footprint
1fixed opening date, met on schedule
Fullguidebook and BOM handed to internal teams

The brief

The client needed a customer experience center that could host enterprise customers and executive visitors, a room that demonstrated live capability rather than slideware.

Two things made it harder than a standard build. The opening was tied to a ribbon-cutting date that couldn't move. And the room couldn't be a one-off. It had to set a display and streaming standard that eight other facilities could deploy without the original design team on site.

Scope

Experience & exhibit design
Spatial layout, visitor flow, furnishing specification and resident content
AV, display & compute
Commercial display specification, endpoint compute, live demonstration hardware
Streaming architecture
End-to-end distribution design, implementation guidebook and bill of materials for the eight-facility rollout
Code compliance
NEC/NFPA remediation and permanent power specification
Sourcing & vendors
Bill of materials, procurement, fabrication vendors and install oversight

Approach

  1. Designed the room and its content as one system

    The space was never waiting on content, and it never carried hardware it didn't need.

  2. Chose a stack that could be repeated cheaply

    Commercial display panels driven by single-board compute endpoints, with a dedicated AI compute node for live demonstrations, on a standard Linux base. That meant low cost per endpoint, no proprietary lock-in and a system a local team can support.

  3. Caught a code problem during install

    Temporary power had been run through daisy-chained extension cords. That's an NEC/NFPA violation and a real fire risk in a room built to host executives. I fixed it on site with UL-listed PDUs and specified permanent floor boxes for the finished build.

  4. Wrote the standard down

    The AV and streaming architecture was documented as a full implementation guidebook with a bill of materials, so the other eight facilities could deploy without repeating the design work.

Architecture, abstracted

Experience center AV and streaming architecture Content sources feed compute endpoints, which feed a distribution layer, which drives commercial display walls. The same stack is documented with a bill of materials and replicated across eight facilities. Content sourcesCompute endpointsDistribution layerDisplay walls media, live feedsSBC + AI nodenetwork + controlcommercial panels Site 1Site 2Site 3Site 4Site 5Site 6Site 7Site 8 SAME STACK REPLICATED ACROSS EIGHT FACILITIES Documented as a repeatable standard with a bill of materials Architecture, abstracted Content sources feed compute endpoints, which feed a distribution layer, which drives commercial display walls. The same stack is documented with a bill of materials and replicated across eight facilities. Content sources media, live feeds Compute endpoints SBC + AI node Distribution layer network + control Display walls commercial panels SAME STACK · EIGHT FACILITIES · THREE COUNTRIES Documented as a repeatable standard with bill of materials
A simplified view of the system. The full implementation guidebook and BOM stay with the client.

Result

The center opened on schedule and was inaugurated with a ribbon-cutting event. I produced the launch content in house.

The documented standard now covers eight facilities across three countries, and internal teams can deploy it without the original designer on site.

Also delivered for this client

Alongside the experience center, I designed the client's CES trade show experience and delivered several more exhibition environments in the same period. It was the same design, fabrication and AV discipline, on a show-floor schedule.

What it shows

  • Single point of ownership

    Design, AV engineering, sourcing, install oversight, content and documentation, all handled by one lead instead of coordinated across three vendors.

  • Technical depth beyond creative

    Systems architecture, endpoint compute and electrical code are treated as part of the brief, not escalated to someone else.

  • Built to be handed over

    The deliverable was a working room plus the written standard that lets other teams reproduce it, with no ongoing dependency on the designer.

Client environments are published only with written approval. Details here are limited to what has been cleared for sharing. Named references are available on request.

Building a briefing center or show floor?

Bring me in at design, and I'll stay through commissioning.

The full named case study, with references, is available on request for qualified projects.